Project:
Construction of WWTP in Maritza River Basin, Lot 2: Dimitrovgrad for 70 000 PE (FIDIC Yellow Book)
– Taking-over Certificate acc. to FIDIC from 10.11.2010
– Use Permit № СТ-05-1505/17.12.2010
Value: Consultancy Services – 2 048 194 levs; Construction Works – 15 755 395 levs
Date of conclusion of the contract: 27.05.2003